Master Plan Committee Meeting
February 10, 2008
Present: Father Ryan, Dawn Braum, Jay Chamernik, Ora Moore, Len Petrovic, Doreen Reeves, Jim Sullivan
Below are items to be considered:
Resecure/repair kneelers throughout the Church
Very low water flow in men’s washroom in Church vestibule. Sinks are loose from their mountings in both washrooms at south end of Church
Check into handicap accessibility (unisex) washroom to be installed at south end of Church
Windows in high bay area in Church – completed
Roof maintenance of Church and Hunter Hall – pending
Identify handicap parking area
Parking lot repairs – evaluate in spring
Grass growth in paved area cracks – Church parking lot
Carpeting in guestroom & hall in rectory stairway has been replaced
Add railings and repair portable stairway in front of stage. Possibly add wheels to improve mobility.
Install men’s and Women’s signs over washrooms by stage
Facade at high bay area (Church exterior). Repair or cover with siding.
Step crack in toilet area of women’s bathroom by stage (block wall)
Repair floor tile by west door in Hunter Hall
Possible leaking toilet in men’s washroom by stage
Check into tritium exit signs (10) – consider purchase and installation – work completed
Floor tile by north exit door at outside wall behind stage needs repair
Bottom of door frame is rusting at north exit Hunter Hall
Install light switch at west wall to boiler-room
Install door sweep at east side north exit door in boiler room
Install door sweep at north door at kitchen in Hunter Hall
Remove old sidewalk heater unit off kitchen storage
Bathroom in Father Ryan’s office base heater requires painting
Check on battery backup for smoke detector & C02 alarms
Check into thermal pane window in Father’s bedroom & sitting room
Long room closet in rectory – check into small closet possible damage to ceiling from preexisting condition
West guest bathroom in rectory very poor water flow, staining etc.
Install wire nut over electrical pull box & install cover plates in rectory
Install vinyl deck floor carpet cover at Mary’s desk
Small step crack inside garage east wall
Patch hole in concrete floor at north end (fill with concrete) of garage
Repair crack in east wall at foundation in basement of rectory
Building exteriors and grounds will be looked at in spring.
After review/comments from Finance Committee, priorities will be assigned and an action plan will be developed
Jay Chamernik
Chairman